Coal Mine Resources Development and Utilization Plan |
煤炭资源开发利用方案 |
Description |
说明书 |
Revised |
修改地 |
China Coal Handan Design Engineering Co., Ltd |
中煤邯郸设计工程有限责任公司 |
addendum |
附加物,附录 |
Engineering No. |
工程编号 |
Construction Size |
建设规模 |
Inner Mongolia |
内蒙古 |
the Inner Mongolia Autonomous Region |
内蒙古自治区 |
Location |
(矿井)位置 |
Subordinative Relationship of the Mine |
隶属关系 |
subordinative [səbɔ:dinətiv]adj. |
从属的,表示从属关系的 |
drilling and blasting |
炮掘 |
mining method |
采煤方法 |
coal seam |
煤层 |
coal thickness(m) |
煤厚 |
strike length(m) |
走向长度 |
incline width(m) |
倾向宽度 |
mining height(m) |
开采高度(采高) |
specific gravity(t/m3) |
容重 |
daily cycle |
日循环数 |
drivage per cycle(m) |
日循环进度(指掘进) |
output per cycle(t) |
循环产量 |
daily output(t) |
日产量 |
coal recovered(10 kt) |
煤炭回收量(万吨) |
remarks |
备注 |
drivage n. |
掘进 |
driving place,developing face |
掘进工作面 |
stoping n.(stope的ing形式) |
回采 |
development n. |
开拓 |
mining n. |
开采 |
total planned drivage(m) |
计划掘进总长度 |
mining team No.1 |
综采一队 |
developing team No.2 |
掘进二队 |
Subtotal |
小计 |
Total |
合计 |
Grandtotal |
总计 |
Working face ID |
工作面编号 |
detail list, breakdown |
明细表 |
Contents |
目录 |
Chapter |
章 |
section |
节 |
General situations |
概况 |
Overview |
概述 |
Traffic and location |
交通位置 |
Natural geography |
自然地理 |
Enterprise type |
企业性质 |
Preparation basis |
编制依据 |
Status quo and forecast of mineral demand |
矿产品的需求现状及预测 |
Coal price analysis |
煤炭产品价格分析 |
General situations of mineral resources |
矿产资源概况 |
Minefield structure and geological feature |
井田构造及地质特征 |
Mining conditions and Hydrogeology conditions |
开采技术条件及水文地质条件 |
Mineral resources reserves |
矿产资源储量 |
Comments on Geological survey Report |
对地质勘探报告的评述 |
Construction Plan |
建设方案 |
Mining Plan |
开采方案 |
Water prevention and control program |
防治水方案 |
Prevention of the gas and coal dust explosion |
防治瓦斯、煤尘爆炸 |
Mine fire prevention |
矿井防灭火 |
Minefield development and mining |
井田开拓与开采 |
Mine characteristic and development principle |
矿井特点及开发原则 |
Minefield development |
井田开拓 |
underground mining |
井下开采 |
Coal processing |
煤的加工,煤的洗选 |
Coal quality |
煤质 |
Environmental protection |
环境保护 |
Major sources of pollution and pollutants |
主要污染源和主要污染物 |
Ecological changes caused by mine development |
矿井开发引起的生态变化 |
Designed with environmental protection standards |
设计采用的环境保护标准 |
Preliminary plan of pollution control |
控制污染的初步方案 |
Development Plan Brief Conclusions |
开发方案简要结论 |
Available reserves of mine design, design duty and service life |
设计可采储量、设计生产能力、服务年限 |
product scheme |
产品方案 |
Mine industrial field location and scheme of mining and development |
井口工业场地位置及开拓开采方案 |
Brief assessments for engineering project |
对工业项目的简要评述 |
Issues and suggestions |
存在的问题及建议 |
attached Document |
附件 |
entrustment letter |
委托书 |
Record-Keeping Certification |
备案证明 |
Review Opinions on Report for |
评审意见书 |
Attached drawings |
附图 |
attached file |
(邮件的)附件 |
Surface and underground map of |
井上下对照图 |
plane map |
平面图 |
section map |
剖面图 |
Mining area |
矿区范围 |
Geological and Topographic map |
地质地形图 |
General Layout Plan of |
总平面布置图 |
geographic coordinate |
地理坐标 |
Its traffic is comparatively convenient |
交通较为方便 |
Topography and landform |
地形和地貌 |
The mining area topographic dissection is intense |
矿区地形切割强烈 |
dry season |
干季,旱季 |
rainy season |
雨季 |
private enterprise |
民营企业,私营企业 |
minable coal seams |
可采煤层 |
one-third(1/3) coking coal |
1/3焦煤 |
the raw coal ash contents are between 15% and 25% |
原煤灰分为15%-25% |
the total sulphur contents of raw coals are between 0.2% and 0.5%. |
全硫0.2%-0.5% |
production |
生产,产量(指宏观的) |
product |
产品(指微观的) |
civilian use |
民用 |
Coal preparation plant(CPP) |
洗煤厂 |
Preface |
前言 |
be administered by the authorities of |
行政区划隶属于(准格尔旗窑沟乡)管辖 |
workload,workvolume |
工程量(工作量) |
commissioning |
投产 |
shaft bottom |
井底车场 |
working face |
工作面 |
haulageway,haulage roadway |
运输巷 |
main haulageway |
运输大巷 |
main roadway |
大巷 |
track transport, track haulage |
轨道运输 |
trackless transport |
无轨运输 |
track roadway |
轨道巷 |
air-return roadway |
回风巷 |
roadway |
巷道 |
shaft |
井筒 |
incline, inclined shaft |
斜井 |
shaft, vertical shaft |
竖井 |
vertical shaft development |
竖井开拓 |
mine construction |
矿井建设 |
mine construction volume |
矿建工程量 |
district |
采区 |
roof |
顶板 |
floor |
底板 |
false roof |
伪顶 |
immediate roof |
直接顶 |
main roof |
老顶 |
roof stability |
顶板稳定性 |
working face |
回采工作面,采煤工作面 |
coal mining method |
采煤方法 |
blast-winning technology |
爆破采煤工艺 |
mining level |
开采水平 |
longwall mining on the strike |
走向长壁采煤法 |
advancing mining |
前进式开采 |
retreating mining |
后退式开采 |
upward mining |
上行式开采 |
downward mining |
下行式开采 |
belt transporter |
胶带输送机 |
extensible belt transporter |
可伸缩胶带输送机 |
belt |
胶带,皮带 |
belt roadway |
皮带巷 |
transfer |
转载,转运 |
transfer point |
转载点 |
transloader |
转载机 |
coal mining |
采煤 |
caving the roof |
放顶 |
inclined roadway |
斜巷 |
level working,horizontal working |
平巷 |
shaft sinking and drifting |
井巷工程 |
setup room |
切眼 |
adit |
平硐 |
tunnel |
隧道 |
shaft mouth |
井口 |
main shaft |
主井 |
air shaft,ventilating shaft |
风井 |
synchronize |
使同步 |
roadway support |
巷道支护 |
shield(support) |
采煤支架(掩护式支架) |
chock-shield |
支撑掩护式支架 |